Belvidere
Cold Chain Shift Optimization
Overtime cut nearly in half — from 29.6% to 16.7% — by restructuring shifts, not by hiring.
Read case study →Case studies from live 3PL deployments.
Belvidere
Overtime cut nearly in half — from 29.6% to 16.7% — by restructuring shifts, not by hiring.
Read case study →Rochelle
A projected six-figure annual recovery from an indirect labor operation — surfaced when 22,167 instance records revealed three distinct populations hiding inside one daily average.
Read case study →Crest Hill
A two-stage heuristic for a ~9-million-variable slotting problem at site scale, where exact MILP methods become infeasible and operational constraints have to be respected.
Read case study →